Construction Services

WEE GUAN CONSTRUCTION PTE LTD was established in 1991.Core business is focused on UTILITY INFRASTRUCTURE NETWORK in Singapore. Company specializes in the Power Cable, Gas Main, Telecommunication and Cable TV infrastructure developments and Civil Engineering in Singapore.

The Company is registered with BCA for the following workheads:

  • CW02 – Civil Engineering (Grade C3)
  • CR07 – Cable / Pipe Laying & Road Reinstatement (Grade L6)

Scope of Works and Services

Civil Works

  • Trenching works for installation of pipes and conduits.
  • Installation of OGB, pedestals and node boxes.
  • Construction of cable pulling manholes.
  • Restoration and reinstatement works of roads, kerbs, footpaths, drains, turfing, road paintings, etc.

Cabling Works

  • Laying of High Tension and Low Tension Power Cables in the underground transmission and distribution network.
  • Laying of Optic Fibre Cables.
  • Laying of Coaxial / CATV Cables.
  • Laying of Data and Communication cables.

Engineering Works

  • Cable splicing / jointing and terminations.
  • Testing and commissioning
  • Detection of underground services.
  • Trenchless Technology using Horizontal Directional Boring.
  • Road milling and patching as well as resurfacing.
  • Coring and ductseals.

Surveying

  • Topographical surveys using total station.
  • As built drawings using AutoCAD format.

Key Personnel

NG TIAN SOO
Managing Director (MD)

Mr Ng has over 28 years of experience in the Singapore construction industry, specializing in PUB, Singapore Power & TAS underground piping works, which includes road reinstatement. He has excellence rapport with Principals’ representatives, government agencies and is very knowledgeable and hands-on in the underground piping works and road maintenance businesses. Mr Ng holds directorships in few other subsidiaries and related companies in Singapore and Malaysia.

HO TECK HONG
Director - Business Development

Mr Ho holds a B.Eng. (Civil) and a M.Sc (ICM). His past working experience includes, holding the position of Site Engineer in a large construction company, which is actively involves in earthworks, sea reclamation, foundations, and structural engineering. He has also accumulated more than 15 years of experience in PUB’s power cables distribution projects and 8 years in StarHub CATV projects. Mr. Ho is also a holder of PUB – LCDW.

YEO YONG WAH JASON
Project Director

Mr Jason holds Diploma in Electrical Engineering. Diploma in Industrial Management. Construction Safety Course for Project Managers. Certificate in Pavement Construction & Maintenance.

NG TIAN FAH
Operation Director

Mr Tian Fah has 12 years in PUB cable installation project in Singapore. Holder of PUB certificate of Attendance for Underground Services Detection, Building construction Safety Supervisors Certificate (CITC) & licensed excavator operator with Certificate of Competency from CIDB. First Aid Certificate. SIC (Manhole) for Supervisor.

Track Record

Name Of Client Project Title Scope Of Work
 SP Telecom  CABLE / DUCT INSTALLATION ROAD
Reinstatement of Road Trenches for East 1 Zone Central (Contract 1990340)

HDPE DUCT INSTALLATION & ROAD
Reinstatement for Zone Central 2 (Contract 9000100)

HDPE DUCT / CABLE INSTALLATION & ROAD
Reinstatement for Zone East 2
(Contract 9010266) 
Topographical survey of ducts trenching.

Route, including joint position, duct pot-ends, pipe starting and ending points.

Including control points (CP), manhole locations, building lines, boundary fences, car parks, road edges, centre dividers and specific landmarks within 20m on each side of the centre line of duct trench. As-built drawing submission. 
Singapore Power THE CABLE / DUCT INSTALLATION & ROAD
Reinstatement For Zone Central 2 For SP Telecom
 
Topographical  survey of ducts trenching route, including joint position, duct pot-ends, pipe starting and ending points.

Prominent and up-to-date land features, including control points (CP), manhole locations, building lines, boundary fences, car parks, road edges, centre-dividers and specific landmarks within 20m on each side of the centre line of duct trench.

As-built drawings submission.
Power Gride Ltd CABLE INSTALLATION, CABLE JOINTING & ROAD REINSTATEMENT 
Topographical survey of power and  auxiliary cable trenching route, including joint positions, cable pot-ends, pipe starting and ending points and all the electrical distribution boxes where the cables are terminated at e.g. substations, over ground boxes (OGB), meter rooms(MRB), public lighting boxes(PLB), consumer rooms (CUS), substation block services (SBS), overhead poles(OHP), and housing board meter room(HMR) which fall within the survey corridor. Prominent and up-to-date land features, including control points(CP), manhole locations, building lines, boundary fences, car parks, road edges, centre-dividers and specific landmarks within 20m on each side of the centre line of duct trench. As built drawing submission.
AJ Consruction & Transporation  CABLE INSTALLATION, CABLE JOINTING & ROAD REINSTATEMENT
for RNN North(Contract 9030167C)

CABLE INSTALLATION, CABLE JOINTING & ROAD REINSTATEMENT
for RNN North(Contract 9030167N)

CABLE INSTALLATION, CABLE JOINTING & ROAD REINSTATEMENT
for RNN North / West (Contract 9040120) 
Topographical survey of power and auxiliary cable trenching route,including joint positions, cable pot-ends, pipe starting and ending points and all the electrical distribution boxes where the cables are terminated at e.g substations, over ground boxes (OGB), meter rooms (MRB), public lighting boxes (PLB), consumer room (CUS), substation block services (SBS), overhead poles (OHP), and housing board meter room (HMR) which fall within the survey corridor.

Prominent and up-to-date land features, including control points (CP), manhole locations, building lines, boundary fences, car parks, road edges, centre-dividers and specific landmarks within 20m on each side of the centre line of duct trench. As built drawing submission. 
MKI Worldcom Asia Pte Ltd MANHOLE CONSTRUCTION& PIPE
Installation for West Coast, Suntec CIty, Ubi Ave, Kim Chuan Road, Woodlands, Jurong East & Bouna Vista Road 
Topographical survey of pipe trenching route, Manhole location and as built-drawing submission.Survey for LTA application drawing indicating footpath, drains, side table,lamp poles etc.
Singapore Cable Vision Ltd CABLE CONSTRUCTION- HOIZONTAL NETWORK LTA application survey & drawing indicating footpaths, drains, side tables, lamp poles, manholes, OGB, bus bay etc.

SCV claims drawings for Trenching and Miling & Patching Works.

NPark & ENV drawings for drainage and side table to support the LTA application 
Verizone Business        MANHOLE CONSTRUCTION, PIPE INSTALLATION Topographical survey of power and auxiliary cable trenching route, including joint positions, cable pot-ends, pipe starting and ending points and all the electrical distribution boxes where the cables are terminated at e.g. substations, over ground boxes (OGB), meter rooms (MRB), public lighting boxes (PLB), consumer rooms (CUS), substation block services (SBS), overhead poles(OHP) and housing board meter room (HMR) which fall within the survey corridor. Prominent and up-to-date land features, including control points(CP), manhole locations, building lines boundry fences, car parks, road edges, centre-dividers and specific landmarks within 20m on each side of the centre line of duct trench. As built drawing submission.
M1 LimitedMANHOLE CONSTRUCTION, PIPE INSTALLATIONTopographical survey of power and auxiliary cable trenching route, including joint positions, cable pot-ends, pipe starting and ending points and all the electrical distribution boxes where the cables are terminated at e.g. substations, over ground boxes(OGB), meter rooms(MRB), public lighting boxes(PLB), consumer rooms(CUS), substation block services (SBS), overhead poles(OHP) and housing board meter room(HMR) which fall within the survey corridor.

Prominent and up-to-date land features, including control points(CP), manhole locations, building lines boundary fences, car parks, road edges, centre-dividers and specific landmarks within 20m on each side of the centre line of duct trench. As built drawing submission.

Top


Copyright © 2010 Wee Guan Construction, All Rights Reserved Designed and Developed by Maxias